Union County issues its own septic permits through the Environmental Health division's On-site Water Protection Program, and the path has four stops. First the soil evaluation: a county soil scientist walks the lot and reads backhoe pits, and for a new system the owner supplies the backhoe, at least a two-foot bucket with a trained operator, on the day. One application covers up to three acres. If the soil passes, the Improvement Permit says what kind of system the lot can carry and where it goes.
The Construction Authorization follows the design and is priced by system type, so a conventional gravity system costs less to permit than a low-pressure-pipe or aerobic system. The installer builds to the authorization, the county inspects before anything is backfilled, and the Operation Permit closes the file. Keep that permit: a buyer's lender will ask for it, and an addition that adds a bedroom has to go back through the office. It still surprises us how many sellers have never seen theirs.
Why so many lots here end up on low-pressure pipe: the Piedmont clay under Waxhaw, Weddington, Marvin and Wesley Chapel drains slowly, and when a gravity trench would sit wet the county calls for small-diameter pressurized lines dosed from a pump tank. Every permit also sets aside a repair area, the second field you hope never to build. Questions for the office: (704) 283-3553.
$400Improvement Permit, residential
4 stopsevaluation to Operation Permit
| Stop | What happens | County fee |
|---|
| 1. Soil evaluation and Improvement Permit | County soil scientist reads backhoe pits (owner supplies the backhoe); the permit names the system type and repair area | $400 residential |
| 2. Construction Authorization | Design approved; fee set by system type, Type II gravity to Type VI large systems | $200 to $1,200 |
| 3. Installation and inspection | Certified installer builds to the authorization; county inspects before backfill | included |
| 4. Operation Permit | Issued after the final inspection; keep it for the next buyer and any addition | included |
Fee schedule effective August 1, 2024, Union County Environmental Health. Repair authorization $100, redesign $125, commercial Improvement Permit $500.